The resource requirements of work centers are contained in resource flow property sheets, which contain all the standard resource flow tabs, along with the Simulation tab.
The Simulation tab contains the following properties:
Name |
Description |
---|---|
Required resource |
Specifies the way in which the resource is used by the work center:
Scripting name: ResourceRequire |
Minimum / Maximum number of resources |
Specify the minimum and maximum numbers of this type of resource required at the process. Modify the minimum value if you need more than one unit of this resource to perform tasks at this process, and the maxiumum value, if the process can work faster with more resources. Default value: 1, 1 Scripting name: ResourceMinNumber, ResourceMaxNumber |