Create an Extract and Load (EL) project in Sybase IQ InfoPrimer, selecting Materialization with Replication Server.
In the RepServer tab of the EL project editor, you must also specify connection information for the primary Replication Server and the replicate Replication Server, if it is different from the primary. Sybase IQ InfoPrimer adds a command to the Processing tab. Do not modify or delete this command.
For each source table, Sybase IQ InfoPrimer creates the required staging table definitions. Generate these staging tables on the replicate Sybase IQ database by selecting the Create missing destination tables icon on the Tables tab of the EL project editor.
Note: If you are attempting to rematerialize, you must clear the rs_status table.