Upgrade the cluster subsystem.
HPIA – MCSG 11.18
IBM AIX – PowerHA 7.1
Sun Solaris – VCS4.0, SunCluster 3.2
Linux-AMD – VCS4.1
Win2008 R2 – Failover Cluster
There are two ways to upgrade a cluster subsystem:
Relocate the primary resource group to N2 or shut down ASE1. This causes ASE1 to fail over from N1 to N2.
Upgrade the cluster subsystem on N1 following the upgrade instructions provided by the vendor.
Fail back ASE1 from N2 to N1. See the appropriate cluster chapter in Using Sybase Failover in a High Availability System for more details on SAP ASE failback.