With the first data tier installed, you can complete the configuration of the failover cluster to handle all the tasks involved in switching the two data tier nodes between active and passive states.
If you see error messages, there is a problem with the installation that you must fix before proceeding.
If you do not check the error logs immediately after installing the data tier, the log contains pairs of lines beginning Starting checkpoint... and Finished checkpoint.... As long as these are the only lines logged after Now accepting requests, the database is operating properly.
Set these services to start manually so that Microsoft Failover Cluster can have full control over starting and stopping them.
For details, refer to the Microsoft Failover Cluster documentation.