Preparing Cluster Nodes for the Upgrade

Shut down Unwired Platform services on cluster nodes in an exact sequence.

  1. Shut down the Sybase Unwired Server service on each scale-out node.
  2. Shut down the secondary Unwired Server – shut down services in this order:
    1. Sybase Unwired Server
    2. Sybase Control Center X.X
    3. Sybase Unwired SampleDB (not present in Enterprise Server Edition)
  3. Shut down the primary Unwired Server – shut down services in this order:
    1. Sybase Unwired Server
    2. Sybase Control Center X.X
    3. Sybase Unwired SampleDB (not present in Enterprise Server Edition)
  4. Shut down the data tier server – shut down these services, in any order:
    • Sybase Unwired CacheDB service (named SAP Mobile Platform CacheDB service in SAP Mobile Platform 2.3)
    • Sybase Unwired ClusterDB service (named SAP Mobile Platform ClusterDB service in SAP Mobile Platform 2.3)
    • Sybase Unwired LogDataDB service (named SAP Mobile Platform LogDataDB service in SAP Mobile Platform 2.3)