When you have completed installing and verifying
all
cluster nodes, verify the functionality of the full cluster to ensure that the installation
process has been completely successful.
- Start Sybase Control Center. From an
Unwired Server node that is not a scale-out node, choose .
- Make sure you can
see all the Unwired Server nodes (both
application server and scale-out) in the cluster.
- Select each
Unwired Server node (both application
server and scale-out nodes) and inspect the settings.
All information should be filled in, with no error
messages.

Next
Go to the
SAP Software Download Center at
https://websmp209.sap-ag.de/swdc (requires an S-user ID with
SWDOWNLAD Software download authorization, provided by the
Super Administrator for your SAP products) and locate the
Support
Packages and Patches page for the version of Sybase Unwired Platform you have just installed.
- If a support package is available for this version of Sybase Unwired Platform:
- Use the Readme for the
support package to upgrade your Sybase Unwired Platform installation to the support package version
now.
- After you have upgraded to the support package version,
continue with postinstallation tasks in Completing New and Upgrade Installations in Landscape Design and Integration.
- If no support package is available, continue now with
postinstallation tasks in Completing New
and Upgrade Installations in Landscape Design and
Integration.