Use this REST request to stop a running ESP project. This REST request is a POST type request.
http://serverDetails/espws/restservice/project/<projectName>?action=stop&workspace=<workspaceName>
| Element | Description |
|---|---|
| connectionDetails |
(Required) Element containing cluster, port, and authentication details below. |
| clusterName |
Type: string (Required) The name of the cluster on which the project that you wish to update is running. |
| port |
Type: integer (Required) Specify the port on which the cluster is running. |
| authentication |
(Required) Element containing authentication details. |
| type |
Type: string (Required) Specify the type of authentication the ESP Server is using. Valid values are user, rsa, and kerberos. |
| data |
Type: string (Required) Specify a value based on the type of authentication
you specified in the type element. For
example,
|
| sslEnabled |
Type: boolean (Required) Specify whether SSL is enabled on the cluster on which the project is running. The default value is false. |
http://localhost:9091/espws/restservice/project/myproject?action=stop&workspace=defaultBody
{
“connectionDetails": {
"clusterName": "iltlvl231",
"port": "19011",
"authentication": {
"type": "user",
"data": "lroot:<password>",
"sslEnabled": "true"
}
}
}