Update either a Sybase IQ or a ASE physical data model from a ESP Schema logical data
      model.
- Open the ESP Schema model.
 
- From the PowerDesigner main menu, choose .
 
- In the General tab of the PDM Generation Options dialog,
               choose Update existing Physical Data Model.
 
- Select the model and leave Preserve Modifications
               selected.
 
- Click the Detail tab.
 
- (Optional) Choose Check model and Save generation
                  dependencies.
 
- Ensure that Enable transformations is selected.
 
- In the Merge Models dialog, confirm the updates you want and choose
                  OK.
 
Next
After generation, check indexes, set physical options, and add foreign keys as
         needed.