Installing Developer Edition on a Single Server

Install Unwired Server, the data tier, Afaria, and developer components on a single server or developer workstation. Optionally, install developer components on additional developer workstations.

Prerequisites

Going through the appropriate task flow in Developer Edition Task Flows, you should have performed these tasks:

Note: You cannot upgrade a single-server installation of Unwired Platform to a cluster setup. If you want to have cluster support available in your development environment, install in a cluster initially. See Performing a Cluster Installation of Developer Edition.
Note:

If you run the Developer Edition installer again on a machine where you have already installed Unwired Platform version 1.5.2, the installer detects the existing installation and takes you to the component selection page as soon as you have accepted the end user licensing agreement. Resume with step 12 in Performing a Custom Installation of Developer Edition.

  1. Start the Sybase Unwired Platform installer using one of these methods:
    • Insert the Sybase Unwired Platform installation media.
    • Install from a Web download. Extract the four archives to the same temporary directory on a local disk, not a shared drive.
    • Install from an image on the network. You must access the installation image from a mapped drive, not a UNC path.
    1. If installing from installation media, select Start > Run.
    2. Browse to the location of the setup.exe file on the installation media or in the temporary directory, and click OK.
  2. On the installer welcome page, click Next.
  3. On the license type page, select your license type and click Next.
    Option Description
    Evaluation Allows you to evaluate Unwired Platform for 30 days. A license file is not required.
    Unserved (local) license A standalone license managed locally by your workstation. Be sure you know the location of the license file.
    Served (remote) license A standalone license managed by a license server. Be sure you know your license manager host name and TCP port.
  4. On the end-user license agreement page, accept the terms of the license agreement.
    1. Select the appropriate geographic location and read the license agreement.
    2. Click I Do Agree to the Terms of the Sybase License, for the Install Location Specified, then click Next.
  5. On the license details page, select the information for your product license. See Locating Information in a License File.
    Field Valid values
    License product edition

    • ED: Enterprise Developer Edition
    • PD: Personal Developer Edition
    License type

    If you selected ED for license product edition, license type must be DT: Development and Test License.

    If you selected PD for license product edition, then license type must be SS: Standalone Seat License.

    Note: If you enter a combination of values on this page that does not match your license file, the error is not detected until the installer attempts to check out your license on the next page.
  6. Enter your license information.

    If you selected "Unserved (local) license" as the license type, on the unserved license file page enter the full path to the license file. Click Browse to browse to the file location.

    If you selected "Served (remote) license" as the license type, on the SySAM license manager server page enter the Host Name of License Server and, optionally, change the TCP Port of License Server entry.

    If you see a Failed to check out license error, and you think you may have entered license settings that do not match your license, click OK, then click Back to reenter the license settings.

  7. On the installation directory page, accept the default installation directory or choose a different one.
    • If the directory does not exist, click OK to create it.
    • For best results, use English or Western European characters (cp1252/ISO-8859-1) for the installation directory path and directory names.
    • You can use the underscore or hyphen character, but do not use symbols or spaces in the installation directory name.
    Note: The directory path where Sybase Control Center is installed varies. If the SYBASE environment variable is defined and valid, Sybase Control Center installs in the directory path specified by the variable. Otherwise, Sybase Control Center installs in a sibling directory to the installation directory specified here. For example, if the installation directory is C:\Sybase\UnwiredPlatform, Sybase Control Center installs into C:\Sybase\SCC-3_0.
  8. On the installation type page, select Mobile Developer .
  9. (Optional) Select additional installation options. Choose:
    • Configure Unwired Platform communication ports to change default port numbers.
    • Set Unwired Platform services to start automatically to start Unwired Platform services automatically when Windows starts. If you do not select this option, you must manually start services from the Start menu after every Windows restart.
    • Install Device Application Designer to install this developer component. This option is only available if Unwired WorkSpace is selected to install. If Unwired WorkSpace is already installed, this option is only available from the component selection page.
    • Install Windows Mobile .NET Components to install this developer component. This option is only available if Unwired WorkSpace is selected to install. If Unwired WorkSpace is already installed, this option is only available from the component selection page.
    • Use Unwired Platform with an existing JDK or Eclipse Installation. Indicate the fully qualified path to the existing JDK installation directory. Sybase Unwired Platform requires JDK 1.6.0_16 and Eclipse 3.5.0.
      Note: On 64-bit systems, specify the fully qualified path to an existing 32-bit JDK installation.
  10. A page that says, "One or more required components (prerequisites) are not installed on the system," indicates that the installer has detected missing third-party software.
    Click:
    • Next to have the installer install the required software.
    • Back to select components to install that do not require the third party software.
    • Cancel to cancel the current installation.
  11. (Optional) If you selected "Configure Unwired Platform communication ports" on the additional installation options page, you can change port numbers as required, on the port numbers for Unwired Server page.
    Option Description
    General

    Server Administration

    Standard Internet Inter-ORB Protocol (IIOP) port used by Eclipse and Sybase Control Center to connect to Unwired Server for deployment and administration tasks. The default is 2000.

    To change the port number after installation, use Sybase Control Center (administration console).

    Data Change Notification

    HTTP port used for data change notification (DCN). The default is 8000.

    Synchronization

    Messaging

    The port used for messaging clients to communicate with Unwired Server's messaging server, to synchronizes data between the enterprise information system and messaging-based mobile devices. The default is 5001.

    Replication

    Port number on which Unwired Server synchronizes data between the enterprise information system and replication-based mobile devices. The default is 2480.

  12. On the summary information page, verify the installation features and click Install.
  13. (Optional) Click View Release Bulletin.
  14. Click Finish.
Next