You can update a Word document linked to an RQM so that it includes any changes made in the model.
Note:
If you add graphics to a linked Word document, do not try to update the document from the RQM, you will lose the graphics.
Modify the document and then update the model from the document.
- In PowerDesigner, open an RQM previously linked to a Word document and make any necessary changes.
- Right-click the model or package entry in the Browser and select Update Word Document. Word is launched and the document is parsed and updated.