Preparing Cluster Nodes for the Upgrade

Shut down Sybase Unwired Platform version 2.2.x services on cluster nodes in an exact sequence.

  1. Shut down the Sybase Unwired Server service on each scale-out node.
  2. Shut down the secondary Unwired Server – shut down services in this order:
    1. Sybase Unwired Server.
    2. Sybase Control Center X.X.
    3. Sybase Unwired SampleDB (not present in Enterprise Server Edition)
  3. Shut down the primary Unwired Server – shut down services in this order:
    1. Sybase Unwired Server.
    2. Sybase Control Center X.X
    3. Sybase Unwired SampleDB (not present in Enterprise Server Edition)
  4. Shut down the data tier server – shut down these services, in any order:
    • Sybase Unwired CacheDB service
    • Sybase Unwired ClusterDB service
    • Sybase Unwired LogDataDB service