Upgrading to 16.0 SP2 and SCC 3.3

If you currently use SAP Control Center to manage SAP Sybase IQ resources, and are installing SAP Sybase IQ 16.0 SP2, you must upgrade the SCC server before you upgrade the managed resources. See the SAP Sybase IQ 16.0 SP2 cover letter, included as par of this release, for a list of updates.

SAP Sybase IQ 16.0 SP2 includes SAP Control Center 3.3. SAP Control Center 3.3 is required to administer an SAP Sybase IQ 16.0 SP2 database. SCC 3.3 is also compatible with all previous versions of SAP Sybase IQ from 15.3.

For general SCC installation instructions and deployment strategies for a new SAP Control Center installation, see the SAP Control Center section in the Installation and Configuration Guide.

Related concepts
Upgrading to 16.0 SP2
Support Package Installation Workflow