Preparing for the First Host Upgrade

Shut down Unwired Platform services on cluster nodes in an exact sequence and take cluster resources offline on the active node.

  1. Make sure the active data tier node is on the same host server as the primary Unwired Server node.
    If it is not, use Failover Cluster Manager to move the cluster's File Server service to the other data tier node.
  2. Shut down the secondary Unwired Server – shut down services in this order:
    1. Sybase Unwired Server
    2. Sybase Control Center X.X
  3. Shut down the primary Unwired Server – shut down services in this order:
    1. Sybase Unwired Server
    2. Sybase Control Center X.X
  4. Go to the desktop of the active node.
  5. In Failover Cluster Manager on the active node, make sure the following Unwired Platform resources are offline:
    • Advantage Database Server® service
    • Afaria Database service (available with Unwired Platform version 1.5.2 or earlier)
    • Sybase Unwired CacheDB service
    • Sybase Unwired ClusterDB service
    • Sybase Unwired LogDataDB service
    • Sybase Unwired SampleDB service
  6. Proceed with the first host upgrade on the active node.