Installing Unwired Platform with a Standard Microsoft Failover Cluster

This installation scenario places two data tiers on separate servers within a Microsoft Failover Cluster, and two Unwired Server nodes on separate servers outside the failover cluster, with optional Unwired Server scale out nodes on additional servers. This provides failover capability for the data tier servers and load balancing between the Unwired Server instances. This scenario is suitable for a high-volume production environment that cannot have a single point of failure.

Prerequisites

The architecture, design characteristics, and use cases for this installation scenario are described in Landscape Design and Integration > Designing the Landscape > Standard Microsoft Failover Cluster. The installation instructions in this chapter assume that you have used the Landscape Design and Integration document to design the landscape.

Complete the worksheet for your chosen scenario. Obtain the Excel workbook file with the scenario worksheets by clicking: ../misc/SUP22_Worksheets.zip.

This diagram illustrates the system you are installing with this scenario:


Standard Microsoft Failover Cluster
Note: You cannot install cluster nodes concurrently. You must perform Microsoft Failover Cluster tasks and install the nodes in this cluster in this order:
  1. Perform critical Microsoft Failover Cluster setup tasks.
  2. Install the first data tier.
  3. Prepare Microsoft Failover Cluster for second data tier.
  4. Install the second data tier.
  5. Install the first Unwired Server as an application server node.
  6. Install the second Unwired Server as an application server node.
  7. (Optional) Install Unwired Server scale-out nodes as needed. You can install multiple scale-out nodes, one at a time, in any order.
Task