Start a cluster by starting its nodes. This step is optional for post installation.
If you are performing a basic installation for evaluation, or if you have not yet configured your clusters, you can skip this post-installation task. This information pertains to users ready to start clusters in their production environment. This may consist solely of the single-node cluster provided out of the box, but will most likely involve multiple clusters on different machines. For information on configuring clusters, see the Configuration and Administration Guide.
A cluster must be running before you can deploy projects to it. To start a cluster, start manager nodes first, then controller-only nodes. Follow these steps for each node in the cluster, where <node-name> represents the name of a node in the cluster.