Hybrid Web Container Development Task Flow

Developing a Hybrid Web Container includes these basic tasks.

  1. Open or import a mobile application project with predefined mobile business objects (MBOs).
  2. Deploy the Mobile Application Project:

    b. On the Target Server page, select the server and connect to it.

    c. On the Server Connection Mapping page, map the database connection profile to the server.

  3. Create the application connection in Sybase Control Center (SCC).
    Note: This step is normally performed by the system administrator.
  4. Use the Mobile Workflow Forms Editor to create a new Hybrid Web application.
    Note: Optionally, you can create a Hybrid Web application manually, however, using the Mobile Workflow Forms Editor, automates many tasks and provides integration across different device platforms.
  5. Use the Mobile Workflow Forms Editor to generate screens by dragging and dropping MBOs and MBO operations from WorkSpace Navigator to the Flow Design page.
  6. Create, delete, and edit screens, controls, menus, screen navigations, and so on.
  7. Use the Mobile Workflow Package Generation wizard to generate the Hybrid Web Container files.
  8. (Optional) Customize the generated Custom.js file.
  9. (Optional) If you customized the Hybrid Web application files, re-generate the files using the Mobile Workflow Package Generation Wizard.
  10. Deploy the Mobile Workflow package to Unwired Server.
  11. Install and configure the Hybrid Web Container on the device or simulator.
  12. In SCC, assign the Hybrid Web application to the device user.
  13. On the device or simulator, run, test and debug the Hybrid Web application.

Note: See Sybase Unwired WorkSpace – Mobile Business Object Development for procedures and information about creating and deploying MBOs.