Developing a Hybrid Web Container includes these basic tasks.
- Open or import a mobile application project with predefined mobile business objects (MBOs).
- Deploy the Mobile Application Project:
b. On the Target Server page, select the server and connect to it.
c. On the Server Connection Mapping page, map the database connection profile to the server.
- Create the application connection in Sybase Control Center (SCC).
Note: This step is normally performed by the system administrator.
- Use the Mobile Workflow Forms Editor to create a new Hybrid Web Container.
Note: Optionally, you can create a Hybrid Web Container manually, however, using the Mobile Workflow Forms Editor, automates many tasks and provides integration across different device platforms.
- Use the Mobile Workflow Forms Editor to generate screens by dragging and dropping MBOs and MBO operations from WorkSpace Navigator to the Flow Design page.
- Create, delete, and edit screens, controls, menus, screen navigations, and so on.
- Use the Mobile Workflow Package Generation wizard to generate the Hybrid Web Container files.
- (Optional) Customize the generated Custom.js file.
- (Optional) If you customized the Hybrid Web Container files, re-generate the files using the Mobile Workflow Package Generation Wizard.
- Deploy the Mobile Workflow package to Unwired Server.
- Install and configure the Hybrid Web Container on the device or simulator.
- In SCC, assign the Mobile Workflow application to the device user.
- On the device or simulator, run, test and debug the Mobile Workflow application.
Note: See Sybase Unwired WorkSpace – Mobile Business Object Development for procedures and information about creating and deploying MBOs.