Task Flow

Use this tutorial to develop, deploy, and run a Mobile Workflow package on an emulator or a simulator.

Task Goals Steps
Getting started Install Sybase Unwired Platform, create a connection profile, start the server and Unwired WorkSpace, and create a Mobile Workflow Application project.
  • Installing Sybase Unwired Platform
  • Starting Unwired Platform Services
  • Starting Sybase Unwired WorkSpace
  • Connecting to Sybase Control Center
  • (Optional) Learning Unwired WorkSpace Basics
These steps are prerequisites for the rest of this tutorial. You need to perform them only once.
Developing a database mobile business object Create and deploy a database mobile object.
  • Creating the TravelRequest Table
  • Creating the TravelRequest Mobile Business Object
  • Deploying the Workflow101 Mobile Application Project
Developing the Mobile Workflow package Create a mobile workflow form, generate the files, register the device in Sybase Control Center, assign the Mobile Workflow package to a user, and view the mobile workflow form on the emulator or simulator.
  • Creating a Mobile Workflow Form
  • Installing the Mobile Workflow Package
  • Running the Mobile Workflow Package
  • Verifying the Data on the Backend Database